Ground up construction with NOVA Mission Critical group. The Mechanical/HVAC scope consisted of but not limited to
- Custom EMP shielded Air Cooled Chillers
- Custom EMP hardened hydraulic radiation 1.25 MW Generators
- Daiken AHU’s
- CRAC units
- Fans
- Exhaust fans
- Filters/Modules
- Parallel and Underfloor Fan Powered VAV’s
- Sound Attenuators
- Pump Skids with Expansion Tanks and Air Separators
- VFD’s
- Kitchen Hoods.
- Over 64,000 lbs of sheet metal
- Over 7,000ft of pipe
- 2,700ft of welds
- Over 38,000 man hours on a fast track project of 10 months to execute.