Ground up construction with NOVA Mission Critical group. The Mechanical/HVAC scope consisted of but not limited to

  • Custom EMP shielded Air Cooled Chillers
  • Custom EMP hardened hydraulic radiation 1.25 MW Generators
  • Daiken AHU’s
  • CRAC units
  • Fans
  • Exhaust fans
  • Filters/Modules
  • Parallel and Underfloor Fan Powered VAV’s
  • Sound Attenuators
  • Pump Skids with Expansion Tanks and Air Separators
  • VFD’s
  • Kitchen Hoods.
  • Over 64,000 lbs of sheet metal
  • Over 7,000ft of pipe
  • 2,700ft of welds
  • Over 38,000 man hours on a fast track project of 10 months to execute.