Ground up Construction. Contract Value $5.4MM Mechanical and $2MM Plumbing consisting of;
- HVAC
- Multistack Air Cooled Chiller
- Marley Closed-Circuit Fluid Cooler
- (161) AAON Water Source Heat Pumps
- BAS Controls
- BIM Coordination with Pinnacle
- 75,000 lbs of sheet metal ductwork
- 14,500 L.F. of hydronic piping
- 3,200ft of welds
- 30,100 man hours
- Plumbing
- Domestic water, DWV, Gas Piping, Compressed Air, Wash Rack, Fixtures
- Converted Government from cast iron to PVC due to corrosive nature of environment
- 6,800 man hours
- 18,900 L.F. of piping